National Key Project Hong Kong-Zhuhai-Macao Tunnel Project: Sand and Gravel Conveyor System
+
  • National Key Project Hong Kong-Zhuhai-Macao Tunnel Project: Sand and Gravel Conveyor System

National Key Project Hong Kong-Zhuhai-Macao Tunnel Project: Sand and Gravel Conveyor System

Technical parameters: national key project Hong Kong-Zhuhai-Macao tunnel project: sand and gravel conveying system system: the system consists of 12 conveyors, including 4 B = 1000 unloading trucks (with transverse belt conveyors); Bandwidth: 1000mm total length: 1882m conveying materials: installed power of sand and stone: 45 ~ 160kw conveying capacity: 1000 t/h

WORK DETAILS